2012年5月15日火曜日

2nd Blasting at Spillway Atabad Lake Hunza Valley

Today at 11 am second phase of blasting occured, there are hopes to evacuate dammed water from Attabad Lake Hunza Valley. 1st Phase of blasting was occured in March which evacuated dammed water some extent also KKH between Hussaini to Gulmit was linked.

The dammed water has suffered lives of Gojal upper Hunza Region, also trade between China and Pakistan.

By: Ejaz Karim Shugulo

0 件のコメント:

コメントを投稿